A big help

Thread Tools
 
Old Jul 27th 2005, 9:08 am
  #1  
Guest
 
Posts: n/a
Default A big help

Could people please kindly let us know how long it takes to allocate
case officer for Skill indipendant cat. And how long it takes from
being allocated a case officer to being granted the visa.
 
Old Jul 27th 2005, 1:05 pm
  #2  
BE Enthusiast
 
Joined: Aug 2004
Location: Raleigh, NC, USA (Region 2)
Posts: 607
brian0 is a jewel in the roughbrian0 is a jewel in the roughbrian0 is a jewel in the roughbrian0 is a jewel in the rough
Default Re: A big help

Originally Posted by [email protected]
Could people please kindly let us know how long it takes to allocate
case officer for Skill indipendant cat. And how long it takes from
being allocated a case officer to being granted the visa.
This is asking the proverbial question "how long is a piece of string"! Frankly it's impossible to say how long each of these things will take. Firstly, every case is different - different visa types, different countries, different occupations, etc. Second, DIMIA is a huge unknown to all us looking in from outside. We don't know what will happen down the road. Just look at the July 2004 thing and the latest "re-organisation" that's happening.

All that aside though, you can make some rough guesses about what MIGHT happen. CO allocated could take anywhere from 12 weeks to 20 weeks (give or take 10 weeks!). Time from CO allocated to grant is even more variable depending on whether you "front loaded" anything like meds/pcc, and whether you get asked for further information about your app. It also very much depends on how keen you are about getting info back to DIMIA. You typically get something like 70 days to return info, but things like PCCs from some countried can take months to get back, so this step can really stretch out. On the whole, assuming you did not front-load, your probably looking at 4-8 weeks from the time you return all the info to DIMIA.

I hope that helps, but really it's not a straight-forward question to try to answer. Just take a look at people's timeline in the sigs for an idea of the variability in the whole process!

Cheers,
Brian
brian0 is offline  
Old Jul 27th 2005, 5:00 pm
  #3  
Life is good
 
claire edwards's Avatar
 
Joined: Dec 2003
Location: Perth, WA
Posts: 1,019
claire edwards is a name known to allclaire edwards is a name known to allclaire edwards is a name known to allclaire edwards is a name known to allclaire edwards is a name known to allclaire edwards is a name known to allclaire edwards is a name known to allclaire edwards is a name known to allclaire edwards is a name known to allclaire edwards is a name known to allclaire edwards is a name known to all
Default Re: A big help

Check out my time line...The waiting is really hard to cope with, but something you will be a pro at by the time you get your visa.

good luck!
claire edwards is offline  
Old Aug 1st 2005, 10:24 am
  #4  
Guest
 
Posts: n/a
Default Re: A big help

Dear All,

As I told you my agent told he has lodged the things in first week of
may. And he sent a letter to us with the ref number. But we didnt see
any thing from DIMIA. Now it's almost 12 weeks and no case officer
allocated. My agent told since my nominated occupation is in demand
list I will get the visa within 6-8 weeks. bUT Today I went through the
DIMIA web site And it says Skill independent cat will take 12-15 weeks.
I have lost my confidence over the agent. What you all advise me to do.

Thanks in advance

Lasanthi
 
Old Aug 1st 2005, 11:46 am
  #5  
 
Joined: Jul 2004
Posts: 6,360
bridiej is an unknown quantity at this point
Default Re: A big help

Originally Posted by [email protected]
Dear All,

As I told you my agent told he has lodged the things in first week of
may. And he sent a letter to us with the ref number. But we didnt see
any thing from DIMIA. Now it's almost 12 weeks and no case officer
allocated. My agent told since my nominated occupation is in demand
list I will get the visa within 6-8 weeks. bUT Today I went through the
DIMIA web site And it says Skill independent cat will take 12-15 weeks.
I have lost my confidence over the agent. What you all advise me to do.

Thanks in advance

Lasanthi
I advise you to wait. we are 4 months now and still no news about our case officer, or police checks requested.

as brian said, who knows what's going on we just have to sit and wait although it's a killer!
bridiej is offline  
Old Aug 1st 2005, 1:12 pm
  #6  
BE Enthusiast
 
Joined: Aug 2004
Location: Raleigh, NC, USA (Region 2)
Posts: 607
brian0 is a jewel in the roughbrian0 is a jewel in the roughbrian0 is a jewel in the roughbrian0 is a jewel in the rough
Default Re: A big help

Originally Posted by [email protected]
Dear All,

As I told you my agent told he has lodged the things in first week of
may. And he sent a letter to us with the ref number. But we didnt see
any thing from DIMIA. Now it's almost 12 weeks and no case officer
allocated. My agent told since my nominated occupation is in demand
list I will get the visa within 6-8 weeks. bUT Today I went through the
DIMIA web site And it says Skill independent cat will take 12-15 weeks.
I have lost my confidence over the agent. What you all advise me to do.

Thanks in advance

Lasanthi
I don't think your timeline is anything unusual at all. I would suggest to you that your agent had the wait time off by a factor of 4 (ie: it will take 6-8 months for a visa to come through if you follow the usual route and don't front load stuff). 12-16 weeks wait for a CO and med/pcc request is about the norm right now, with some people waiting longer than that.

As Bridiej says, "I advise you to wait". I know it's not what you want to hear, but you can't rush DIMIA.

Cheers,
Brian
brian0 is offline  
Old Aug 1st 2005, 1:20 pm
  #7  
 
Joined: Jul 2004
Posts: 6,360
bridiej is an unknown quantity at this point
Default Re: A big help

Interesting though that he's told you 6-8 weeks for visa grant and you've waiting 12 already, must mean our application should be being looked at any day now!
bridiej is offline  
Old Aug 1st 2005, 8:48 pm
  #8  
BE Enthusiast
 
sonictigger's Avatar
 
Joined: Jan 2005
Location: Was Kent, UK...now Pacific Pines Gold Coast and loving it
Posts: 800
sonictigger has much to be proud ofsonictigger has much to be proud ofsonictigger has much to be proud ofsonictigger has much to be proud ofsonictigger has much to be proud ofsonictigger has much to be proud ofsonictigger has much to be proud ofsonictigger has much to be proud ofsonictigger has much to be proud ofsonictigger has much to be proud ofsonictigger has much to be proud of
Default Re: A big help

Originally Posted by brian0
I don't think your timeline is anything unusual at all. I would suggest to you that your agent had the wait time off by a factor of 4 (ie: it will take 6-8 months for a visa to come through if you follow the usual route and don't front load stuff). 12-16 weeks wait for a CO and med/pcc request is about the norm right now, with some people waiting longer than that.

As Bridiej says, "I advise you to wait". I know it's not what you want to hear, but you can't rush DIMIA.

Cheers,
Brian
I agree with Brian & Brideij, see our timeline below, we did not front load and our med req took 15 weeks, so hold off worrying just yet...it's hard but hang in there.
sonictigger is offline  
Old Aug 17th 2005, 2:40 am
  #9  
Guest
 
Posts: n/a
Default Re: A big help

Dear All ...

I found few guys got their MCC within three months. As I told my visa
cat is skill independant (nominated job is in demand) Its three 15
weeks now no responce from them. Can I call them and check from DIMIA.
Will it act negatively ??? or can I ask my agent to check with them ???
Please let me know
 
Old Aug 17th 2005, 7:02 am
  #10  
Home and Happy
 
Pollyana's Avatar
 
Joined: Dec 2002
Location: Keep true friends and puppets close, trust no-one else...
Posts: 93,816
Pollyana has a reputation beyond reputePollyana has a reputation beyond reputePollyana has a reputation beyond reputePollyana has a reputation beyond reputePollyana has a reputation beyond reputePollyana has a reputation beyond reputePollyana has a reputation beyond reputePollyana has a reputation beyond reputePollyana has a reputation beyond reputePollyana has a reputation beyond reputePollyana has a reputation beyond repute
Default Re: A big help

Originally Posted by [email protected]
Dear All ...

I found few guys got their MCC within three months. As I told my visa
cat is skill independant (nominated job is in demand) Its three 15
weeks now no responce from them. Can I call them and check from DIMIA.
Will it act negatively ??? or can I ask my agent to check with them ???
Please let me know
I think you've got your answer in the posts above - your agent has probably underestimated the timeline.
Patience is a virtue you need when applying for a visa - and remember, not so long ago it took 18 months or more to get a Skills visa ......
Pollyana is offline  
Old Aug 17th 2005, 7:20 am
  #11  
 
Joined: Jul 2004
Posts: 6,360
bridiej is an unknown quantity at this point
Default Re: A big help

Originally Posted by Pollyana
I think you've got your answer in the posts above - your agent has probably underestimated the timeline.
Patience is a virtue you need when applying for a visa - and remember, not so long ago it took 18 months or more to get a Skills visa ......

Pollyana is right, and unfortunately there is no continuity, so someone might get a CO within 3 months, someone else might wait 5 - no reason for it just how it goes.

Hang in there....... in the meantime I have space in my padded cell if you're interested!
bridiej is offline  
Old Aug 18th 2005, 10:43 am
  #12  
Guest
 
Posts: n/a
Default Re: A big help

Dear All,

Most of people getting their medical requests within three months. its
14 weeks to me.

Is there differencebetween procesing time for skill independant (MODL)
cat adnd SIR catogories.
 
Old Aug 18th 2005, 11:42 am
  #13  
 
Joined: Jul 2004
Posts: 6,360
bridiej is an unknown quantity at this point
Default Re: A big help

Originally Posted by [email protected]
Dear All,

Most of people getting their medical requests within three months. its
14 weeks to me.

Is there differencebetween procesing time for skill independant (MODL)
cat adnd SIR catogories.
Yes, SIR are much quicker.

Most people at the moment on MODL skilled independant are getting requests around 16 weeks.
bridiej is offline  

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off



Contact Us - Archive - Advertising - Cookie Policy - Privacy Statement - Terms of Service -

Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.