International (Guadiana) bridge progress?
#1
BE Enthusiast




Thread Starter
Joined: May 2014
Posts: 462


My wife and I were sat down here at home (UK) on this glorious weather day discussing our options of when to try and get a flight out to Esuri when we both thought - I wonder if the bridge has finished its overhaul? I'm sure it was just over two years ago the scaffold went up in June 2018. I hate driving up those narrowed lanes when a juggernought is coming at me with inches to spare. Too much concentration required !! Is it finished ? or does anyone know when it's due to be finished. One would have thought the work could have progressed quickly during lockdown with almost no traffic.

#2
Forum Regular

Joined: Apr 2018
Posts: 37


No. All work has stopped, we assume for August.

#3
Forum Regular



Joined: Jul 2015
Location: Scotland/Marina Esuri/Baku
Posts: 112


It doesn't seem to be particularly busy with traffic on the bridge and most drivers seem to be adhering well to the reduced speed limit, at least when I have been using the bridge.

#4

Hi is travel between Spain and Portugal now open for tourists?
