![]() |
fadesa
We are currently trying to get "la comunidad" established up in Las Colinas and are hoping to get the building common areas hooked up to electricity, the pool finished and the elevator running. I know all the problems people have w Fadesa contributing their share and would appreciate any comments by others who had similar problems. At the meeting we learned that it will take about 6000€ to get the elevator running! and the Fadesa reps "promised" to do it by OCTOBER. IF that's true it's better news than we expected, but moving in is a pain -lugging everything up 2 flights of stairs. Now we can only hope the pool is opened before summer (they have spruced up the area lately). Anyone still waiting to get an elevator running?
|
Re: fadesa
Why did people purchase when they were unfinished:confused:
|
Re: fadesa
Because most who did got an extra 20-30000€ off the "finished" price.
|
Re: fadesa
Originally Posted by jackytoo
(Post 9423737)
Why did people purchase when they were unfinished:confused:
|
Re: fadesa
They just went through a type otbankruptcy proceedure for their real estate crisis (including C. Esuri).
|
Re: fadesa
Originally Posted by -cordoba-
(Post 9424250)
They just went through a type otbankruptcy proceedure for their real estate crisis (including C. Esuri).
|
Re: fadesa
Hope not.........
|
Re: fadesa
Originally Posted by -cordoba-
(Post 9424528)
Hope not.........
|
Re: fadesa
Originally Posted by -cordoba-
(Post 9423634)
We are currently trying to get "la comunidad" established up in Las Colinas and are hoping to get the building common areas hooked up to electricity, the pool finished and the elevator running. I know all the problems people have w Fadesa contributing their share and would appreciate any comments by others who had similar problems. At the meeting we learned that it will take about 6000€ to get the elevator running! and the Fadesa reps "promised" to do it by OCTOBER. IF that's true it's better news than we expected, but moving in is a pain -lugging everything up 2 flights of stairs. Now we can only hope the pool is opened before summer (they have spruced up the area lately). Anyone still waiting to get an elevator running?
we had our lifts connected in March this year after three n half years,bit late for us has we lugged all are stuff up along with other residents. But cost nothing like 6000E,more like a third of that,at Las Encinas,but now up and running so much easier getting in with shopping and stuff. Ken. |
Re: fadesa
Originally Posted by Teed Up
(Post 9429665)
Hi,
we had our lifts connected in March this year after three n half years,bit late for us has we lugged all are stuff up along with other residents. But cost nothing like 6000E,more like a third of that,at Las Encinas,but now up and running so much easier getting in with shopping and stuff. Ken. |
Re: fadesa
Originally Posted by MikeCol
(Post 9429839)
Lifts!! we have never had lifts on Marina Esuri and those of us who live in the Duplex's have got legs like Tour de France riders;) Regards Bryony
|
Re: fadesa
Originally Posted by Jur
(Post 9430218)
Sorry, but doesn´t that building have only a ground floor and a first floor?
|
Re: fadesa
As long as Fadesa pays for it we don't care what it costs! It seems there's some damage to gears or something. So far the heaviest stuff has been delivered (poor guys) by Carrefour but we still lug tons of stuff up by hand. Hopefully at least the pool will be ready by summer or we'll have to "visit" others to keep cool in theirs! Today it's 35 in Cordoba so enjoy your 29 degrees...
|
| All times are GMT -12. The time now is 1:06 am. |
Powered by vBulletin: ©2000 - 2026, Jelsoft Enterprises Ltd.
Copyright © 2026 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.