Plans for our new part roofed terrace.
#76
BE Forum Addict
Thread Starter
Joined: Dec 2009
Posts: 2,774
Re: Plans for our new part roofed terrace.
The planks on the roof are one long piece! It seems clear to me they got the measurements wrong. Whether from the plans or their own measurements. Either the terrace is wider than it should be or the roof is not the correct width!
#77
BE Forum Addict
Joined: Nov 2012
Posts: 2,096
Re: Plans for our new part roofed terrace.
At this point you should be measuring all of the terrace against the plans to see what is correct and what is not.
A negotiation point could be that when the overhang is installed the lambéria is put on down the roof rather than across as with the inner part. This would be much easier to install otherwise the whole lot would need to be stripped back to the first joist. the lambéria cut all the way up the roof mid joist and the new lambéria fixed to extend to the overhang. Whether you see the aesthetics of the overhang lambéria going in the opposite direction to the rest of the roof is up to you.
Have you checked the floor where the water pools with a straight edge to see if there is a dip that will always collect water?
The builder should be responsible for all the materials needed to install the overhang except the roof tiles which you will have to pay for as they would be have been needed had the overhang been constructed as planned.
#78
BE Forum Addict
Thread Starter
Joined: Dec 2009
Posts: 2,774
Re: Plans for our new part roofed terrace.
The normal length for lambéria (the planks you have on the roof) is 4 M. I suspect you have the joints on top of the joists.
At this point you should be measuring all of the terrace against the plans to see what is correct and what is not.
A negotiation point could be that when the overhang is installed the lambéria is put on down the roof rather than across as with the inner part. This would be much easier to install otherwise the whole lot would need to be stripped back to the first joist. the lambéria cut all the way up the roof mid joist and the new lambéria fixed to extend to the overhang. Whether you see the aesthetics of the overhang lambéria going in the opposite direction to the rest of the roof is up to you.
Have you checked the floor where the water pools with a straight edge to see if there is a dip that will always collect water?
The builder should be responsible for all the materials needed to install the overhang except the roof tiles which you will have to pay for as they would be have been needed had the overhang been constructed as planned.
At this point you should be measuring all of the terrace against the plans to see what is correct and what is not.
A negotiation point could be that when the overhang is installed the lambéria is put on down the roof rather than across as with the inner part. This would be much easier to install otherwise the whole lot would need to be stripped back to the first joist. the lambéria cut all the way up the roof mid joist and the new lambéria fixed to extend to the overhang. Whether you see the aesthetics of the overhang lambéria going in the opposite direction to the rest of the roof is up to you.
Have you checked the floor where the water pools with a straight edge to see if there is a dip that will always collect water?
The builder should be responsible for all the materials needed to install the overhang except the roof tiles which you will have to pay for as they would be have been needed had the overhang been constructed as planned.
The boss came with the main builder, his father, this morning. The father "ranted" a bit at my Hungarian wife with a couple of swear words. The boss sent him home. The father said he had told us about the width but my wife is adamant he didn't. She would have told me if he had. Disappointedly, another builder confirmed to the boss what the father had told us but I reckon he doesn't want to say anything against the father!
#79
BE Forum Addict
Thread Starter
Joined: Dec 2009
Posts: 2,774
Re: Plans for our new part roofed terrace.
The normal length for lambéria (the planks you have on the roof) is 4 M. I suspect you have the joints on top of the joists.
At this point you should be measuring all of the terrace against the plans to see what is correct and what is not.
A negotiation point could be that when the overhang is installed the lambéria is put on down the roof rather than across as with the inner part. This would be much easier to install otherwise the whole lot would need to be stripped back to the first joist. the lambéria cut all the way up the roof mid joist and the new lambéria fixed to extend to the overhang. Whether you see the aesthetics of the overhang lambéria going in the opposite direction to the rest of the roof is up to you.
Have you checked the floor where the water pools with a straight edge to see if there is a dip that will always collect water?
The builder should be responsible for all the materials needed to install the overhang except the roof tiles which you will have to pay for as they would be have been needed had the overhang been constructed as planned.
At this point you should be measuring all of the terrace against the plans to see what is correct and what is not.
A negotiation point could be that when the overhang is installed the lambéria is put on down the roof rather than across as with the inner part. This would be much easier to install otherwise the whole lot would need to be stripped back to the first joist. the lambéria cut all the way up the roof mid joist and the new lambéria fixed to extend to the overhang. Whether you see the aesthetics of the overhang lambéria going in the opposite direction to the rest of the roof is up to you.
Have you checked the floor where the water pools with a straight edge to see if there is a dip that will always collect water?
The builder should be responsible for all the materials needed to install the overhang except the roof tiles which you will have to pay for as they would be have been needed had the overhang been constructed as planned.
It will be fitted top to bottom. Extra supporting joists will be added.
We've negotiated to pay for materials only. We were surprised they admitted the width was their mistake.
Can't see any dips. If I could get my spirit level through gap between floor tiles and fencing I'd be able to check properly. So will wait for the extra bit added to the roof then see whether it makes any difference. The other side is fine.
Last edited by FenTiger; Aug 1st 2022 at 1:58 pm.
#80
BE Forum Addict
Joined: Nov 2012
Posts: 2,096
Re: Plans for our new part roofed terrace.
#82
BE Forum Addict
Thread Starter
Joined: Dec 2009
Posts: 2,774
Re: Plans for our new part roofed terrace.
Only if they do as they explained to us. Can't see the bits of wood they brought yesterday for the joists. Not keen for the main builder to be here. If he comes here and starts "ranting" or complaining we'll have to tell him to leave. His worse habit is rushing what he needs to do and making a hash of things.
#83
Banned
Joined: Jul 2014
Location: Hawley
Posts: 958
Re: Plans for our new part roofed terrace.
Only if they do as they explained to us. Can't see the bits of wood they brought yesterday for the joists. Not keen for the main builder to be here. If he comes here and starts "ranting" or complaining we'll have to tell him to leave. His worse habit is rushing what he needs to do and making a hash of things.
Hungarian builders, One of the joys of our adopted place of abode. I love residing here in Hungary but I have to say I hate the building tradesman I have had engaged to perform work for me in the past. I have painted them all as worthless based upon my experiences with 2 of them. Probably wrongly so but hopefully their are some good builders out there that take pride in their work.
#84
Re: Plans for our new part roofed terrace.
Hungarian builders, One of the joys of our adopted place of abode. I love residing here in Hungary but I have to say I hate the building tradesman I have had engaged to perform work for me in the past. I have painted them all as worthless based upon my experiences with 2 of them. Probably wrongly so but hopefully their are some good builders out there that take pride in their work.
I should add that despite being "only a woman" having renovated many houses in various countries I've a pretty good idea what I'm talking about!
#85
BE Forum Addict
Joined: Nov 2012
Posts: 2,096
Re: Plans for our new part roofed terrace.
#86
Re: Plans for our new part roofed terrace.
When I first moved here and had work done on my house the builders tried to tell me they were working to EU standards which I couldn't possibly know anything about because I'd arrived here from South Africa. Soon shut them because I'd worked on an island which because it was a department of mainland France had to to conform to EU standards. During that time one of my sons had built a large extension to his hotel and opened a new restaurant both of which were inspected regularly to make sure they were up to EU standard.
#87
BE Forum Addict
Thread Starter
Joined: Dec 2009
Posts: 2,774
Re: Plans for our new part roofed terrace.
Looking at our new raised covered terrace the builders should have been supervised 24/7. Plus I'd need a drone to see what they were doing on the roof!
#88
BE Forum Addict
Thread Starter
Joined: Dec 2009
Posts: 2,774
Re: Plans for our new part roofed terrace.
Overhang extended 😁 . Still a little more work to be done.
Been impressed with a new guy who worked here yesterday and today. Seems he's been looking at things with fresh eyes!!!
#90
BE Forum Addict
Thread Starter
Joined: Dec 2009
Posts: 2,774