MOVING 2 BRISBANE IN OCTOBER!
hi im a spark moving to Brisbane soon, ive done my vetassess practical got my visa, what i want 2 no is what do i once im there about gettin my full licence?
|
Re: MOVING 2 BRISBANE IN OCTOBER!
See the post a couple up from yours...Read Me: ARTC & licencing in Australia
That should tell you all you need. How was your practical mate? was it intense? did you answer all questions or have to skip a few? |
Re: MOVING 2 BRISBANE IN OCTOBER!
Hello All,
You don't need ARTC if you have your vetassess cert, the ARTC is for residents only now, you should read the posts by the people having done the PEER course recently with regards to obtaining a full licence. Ask on here if you need any further details. Regards Kevin P.S. You'll love Brisbane. |
Re: MOVING 2 BRISBANE IN OCTOBER!
thanks guys, yeah ive been there b4 i loved it thats why im off back:D
|
Re: MOVING 2 BRISBANE IN OCTOBER!
Jonny
Can you describe your vetasses experience for all us lucky people that have it coming up in october! any tips would be appreciated kirby |
Re: MOVING 2 BRISBANE IN OCTOBER!
yeah the practical was very easy i'd trust my apprentice's to sit it 4 me but my problem is that its not all sorted in australia no1 no's if where gettin the licence yet so i may do the peer course in sa.
|
Re: MOVING 2 BRISBANE IN OCTOBER!
Originally Posted by Kirby Reynolds
(Post 6730851)
Jonny
Can you describe your vetasses experience for all us lucky people that have it coming up in october! any tips would be appreciated kirby In the morning you have regestration(take passport) the a small test of general fairly basic formula based questions (18 in total). When you have done this- I think you are given 45mins which is plenty of time you are taken to your both and given a drawing to fit a consumer unit a tow way lighting circuit and a radial s/o. It's in a mix of pvc t/e and pvc conduit. again plenty of time given. whilst doing this you are asked to complete other tasks such as wiring some resistors to a drawing and calculating the power used in different combinations. Wire up a dol starter (drawing given) then safe isolation and re connect of an appliance. You then have to go back to your little installation and do a polarity test and insulation test and write down the results. All in all not a bad day, and I actually enjoyed it! |
All times are GMT. The time now is 7:24 am. |
Powered by vBulletin: ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright © 2024 MH Sub I, LLC dba Internet Brands. All rights reserved. Use of this site indicates your consent to the Terms of Use.